Shell Pearl project in Qatar

11. 06. 09
|
Shell Pearl project in Qatar

Our Shell Pearl project consists of the delivery of 6 Pon Power Oil & Gas packaged Caterpillar 3616 diesel engine generator sets, installed in desert-proof design enclosures. Click here to review our reference sheet(or go directly to References to review all our reference sheets).

In 2007 'Phase I' (3 enclosures) was shipped to Qatar. Phase II of the same project was delivered in 2008. The site construction of the project started off in March 2008.

Let us take you to the heart of Qatar, where under the burning sun, Phase I was built.

 

Starting off with the construction of the concrete base on which the 3 units will be built.

Delivery of the generator sets for
Phase I.
Placement of the generator sets onto the concrete base (picture 1). Placement of the generator sets onto the concrete base(picture 2).
The generator sets are in place. Unpacking of the materials for building
Phase I.
The construction and installation of the
enclosure mainframe.
Master control cabins placed in the enclosure frame.
Phase I under construction. Enclosure installation of Phase I is finished.
Phase I in a final stadium. (Note: reduced
quality of the photograph due to atmospheric conditions and desert dust.)
Start of the construction of Phase II (left, opposite to phase I.)