• Products & Solutions
  • Customer Service
  • Newsletters
  • References
  • Jobs
  • Contact Us

The Babbage Topside sail away: successful!

30. 09. 09
|
The Babbage Topside sail away: successful!

The Babbage Topside sail away from the SLP Tyneside Facility on route to the Babbage Field, located in the North Sea UK Block 48/2, turned out to be a success.

Achieving the impossible…
The ‘Babbage project’ includes the delivery of the main generation system by Pon Power Oil & Gas. This delivery consists of 4 Capstone Microturbines type C65, which were packaged in a shared enclosure. It was a nerve-racking sprint to ‘achieve the impossible’, but the mile-stone has been reached and SLP-UK realized shipment on September 17, 2009.
For details on the Pon Power Oil & Gas delivery, click here or go directly to the overview of all our Reference Sheets. To read more about the Babbage project, you can visit the SLP-UK website, or go directly to the press release on this project.

© 2004-2011 Pon Equipment and Pon Power All Rights Reserved | Legal Notice | Privacy Statement